Recommendation mode · default
The system is designed to show the operating context, raise an alarm and support the authorised operator’s decision.
We are developing a software and hardware system that connects field sensor data, analysis of threat signals and operator decisions. Monitoring, alarms and equipment feedback form one working picture.

The proposed AMAN architecture links field equipment and software. The AI layer is a development direction; its functions and evaluation are defined within the R&D programme.
Acquire pressure, level, flow and gas readings together with equipment position feedback.
A proposed analytical layer to compare parameters and identify signs of deviation. AI functions require development and separate validation.
A shared web interface for equipment state, trends and the event journal.
Prioritised alarms with operator acknowledgement and recorded events.
The default design provides recommendations. An authorised operator reviews the signal and decides.
The design connects field acquisition, local control, rig software and the operations centre. Interfaces and protection requirements are established during engineering.
The system is designed to show the operating context, raise an alarm and support the authorised operator’s decision.
This option requires a separate safety assessment, operator authorisation and a defined test programme before deployment.
This simplified well, blowout-preventer and tubing diagram illustrates one physical part of the wider system. Pause the loop or inspect any of its four conceptual frames.
Reduced motion is enabled. Select a frame to inspect it.
A scoped engineering programme establishes the requirements and the evidence a pilot must produce.
The programme covers the software platform, local control logic, operator interface and integration with field devices.
Experience from a predecessor engineering system informs the design. AMAN readiness must be established through its own validation programme.
Functional requirements, interface reviews and an agreed test programme precede acceptance and statements about readiness.
Tell us about the existing instrumentation, control equipment and operator workflow. We can define the AMAN integration scope and the evidence required from a pilot.